How much UPS does your site need?
A quick first estimate for partners and their clients. Enter the critical load and the backup time; our engineers confirm the final configuration with you.
Indicative only. Assumes power factor 0.9, an 80 % loading ceiling, 95 % inverter efficiency and a 20 % battery ageing margin. Final sizing follows a site survey.
Ask for a UPS quoteCritical load
The power, in kW, of the equipment that must keep running: servers, network, security, controls.
Backup time
How long the batteries must carry the load, for example until a generator starts or systems shut down safely.
Redundancy
N+1 adds one UPS in parallel, so the site keeps running if one unit fails or is in maintenance.
Looking for a distributor for power, fibre or network equipment?
Send us your bill of materials or project brief. Our sales team replies with availability and pricing within one business day.