UPS calculator

How much UPS does your site need?

A quick first estimate for partners and their clients. Enter the critical load and the backup time; our engineers confirm the final configuration with you.

Redundancy
Recommended UPS rating60 kVA
Battery energy12.6 kWh
Load on UPS74 %

Indicative only. Assumes power factor 0.9, an 80 % loading ceiling, 95 % inverter efficiency and a 20 % battery ageing margin. Final sizing follows a site survey.

Ask for a UPS quote

Critical load

The power, in kW, of the equipment that must keep running: servers, network, security, controls.

Backup time

How long the batteries must carry the load, for example until a generator starts or systems shut down safely.

Redundancy

N+1 adds one UPS in parallel, so the site keeps running if one unit fails or is in maintenance.